CCD dewar: G10 standoffs, fill tube |
CCD flexure system assembly |
CCD head |
CCD flexure in the head, on the dewar |
Vacuum bellows actuator feedthrough |
CCD actuator system partial assembly |
CCD actuator system partial assembly 2 |
Cold finger and preloaded puck installed |
Ian preparing to mount the CCD |
Inspecting the CCD package |
CCD pre-amp PCB |
Header PCB in place |
CCD assembly complete |
CCD assembly read to go in the head |
Greg and Ian mount the CCD assembly |
|
|