Please enable JavaScript, download instructions

PFS photos - click folders to view
Up one level Homepage
 1 | 2 |
 
  CCD dewar: G10 standoffs, fill tube  
 
CCD dewar: G10 standoffs, fill tube
 
  CCD flexure system assembly  
 
CCD flexure system assembly
 
  CCD head  
 
CCD head
 
  CCD flexure in the head, on the dewar  
 
CCD flexure in the head, on the dewar
 
  Vacuum bellows actuator feedthrough  
 
Vacuum bellows actuator feedthrough
 
  CCD actuator system partial assembly  
 
CCD actuator system partial assembly
 
  CCD actuator system partial assembly 2  
 
CCD actuator system partial assembly 2
 
  Cold finger and preloaded puck installed  
 
Cold finger and preloaded puck installed
 
  Ian preparing to mount the CCD  
 
Ian preparing to mount the CCD
 
  Inspecting the CCD package  
 
Inspecting the CCD package
 
  CCD pre-amp PCB  
 
CCD pre-amp PCB
 
  Header PCB in place  
 
Header PCB in place
 
  CCD assembly complete  
 
CCD assembly complete
 
  CCD assembly read to go in the head  
 
CCD assembly read to go in the head
 
  Greg and Ian mount the CCD assembly  
 
Greg and Ian mount the CCD assembly